This $1.3 million project consisted of renovating the existing recreation complex. This included re-grading the site and remodeling and retrofitting the existing buildings. The improvements also consisted of installing a new irrigation system for the complex and updating site lighting and the field surfaces including top soil, sod, and infield skin.
90 South 100 East | Castle Dale, Utah 84513
(435) 381-2523 | info@JandTengineering.com